Henan Zhengzhou Mining Machinery CO.Ltd 86-371-55902868 inczk@zkcorp.com
Construction LECA Rotary Kiln 105t/H Calcination Equipment

Construction LECA Rotary Kiln 105t/H Calcination Equipment

  • High Light

    105t/H Calcination Equipment

    ,

    LECA Calcination Equipment

    ,

    105t/H leca production line

  • Product Name
    LECA Rotary Kiln
  • Capacity
    0.8-105(t/h)
  • Main Equipment
    Rotary Kiln, Granulator Etc
  • Raw Materials
    Light Expanded Clay Aggregate
  • Application
    LECA Production Line
  • Equipment Condition
    New
  • Business Scope
    Design, Manufacturer, Onsite Guidance
  • Voltage
    220V/380V/440V
  • Place of Origin
    CHINA
  • Brand Name
    ZK
  • Certification
    ISO,CE
  • Model Number
    Oil Sludge Calcination Kiln
  • Minimum Order Quantity
    1 Set
  • Price
    Negotiable
  • Packaging Details
    Export standard container or as customers' requirements
  • Delivery Time
    30 days
  • Payment Terms
    L/C, D/A, D/P, T/T, Western Union, MoneyGram
  • Supply Ability
    10 Set / Sets per Month

Construction LECA Rotary Kiln 105t/H Calcination Equipment

Widely Used LECA Rotary Kiln Large Capacity Highly Efficient Long Service Life

 

LECA Rotary Kiln Introduction:

LECA (Light Expanded Clay Aggregate) as a new environmental protection material is widely used in the construction field. It can be made of wallboard, brick and other new wallboard material. It also can be used for insulation, floor, lightweight concrete, water treatment and etc. LECA Rotary kiln is the key equipment in the LECA production. The performance will effect the final LECA quality and production cost directly.

 

Construction LECA Rotary Kiln 105t/H Calcination Equipment 0

 

Before building ceramsite production line, we should first understand the local environmental protection requirements for kiln emissions, focusing on the emission standards for dust content, nitrogen oxides, sulfides, and odors. Then, according to local environmental protection standards, exhaust gas treatment system that meets local requirements is designed.

 

When designing an exhaust gas treatment system, it is necessary to consider the fuel problem, because the components of the exhaust gas are completely different from the burnt rice bran, coal, and natural gas. These must be fully analyzed and understood before construction, and the influence of raw materials, fuels and working conditions on the composition of the flue gas must be fully considered.

 

Construction LECA Rotary Kiln 105t/H Calcination Equipment 1

 

Generally, when we deal with the dust of the kiln tail gas, we will use the kiln tail smoke chamber, cyclone dust collector or ceramic multi-tube dust removal, bag dust removal to solve this problem, and then the instability of the working conditions should be considered in the system design. Then design emergency facilities and dust removal and utilization equipment so that the dust can be easily resolved. Then we will consider whether it is out of stock, low temperature or high temperature. The two ways in investment and later stag, the cost is very different. In addition, according to the flue gas composition and flue gas volume, desulfurization and nitrogen oxide removal are appropriately considered to design and select equipment.

 

Finally, according to whether there is a peculiar smell in the flue gas, choose the corresponding deodorizing device, but the deodorizing equipment on the market is not very durable, and the selection should consider the working conditions.

 

Construction LECA Rotary Kiln 105t/H Calcination Equipment 2

 

Specifications:

 

Model

Capacity

(t/h)

Rotation Speed

(rpm)

Support Quantity Gear Box Motor

Power

(kw)

Model
Ø1.6×32m 0.8-1.5 0.58-2.85 3 Groups ZQ75-50 YCTZ50-4A 18.5
Ø1.9×39m 1.6-4 0.53-1.59 3 Groups ZQ125-7 YCT315-4A 37
Ø2.2×45m 2.5-8 0.214-1.64 3 Groups

Main ZS125-5

Auxiliary ZQ40-40

Main YCT315-4B

AuxiliaryY112M-4

45

4

Ø2.5×50m 7.5-15 0.62-1.5 3 Groups

Main ZS165-5

Auxiliary ZS50-1

Main YCT355-4A

Auxiliary Y160M-6

55

7.5

Ø2.8×55m 8.5-17 0.62-1.5 3 Groups

Main ZS165-6

Auxiliary ZS50-1

Main YCT355-4B

Auxiliary Y160L-6

75

11

Ø3×60m 17-20 0.5-1.5 4 Groups

Main ZS165-3

Auxiliary ZS50-1

Main ZSN-280-11B

Auxiliary Y160L-6

125

11

Ø3.2×50m 20-50 0.788-3.938 3 Groups

Main NZS995-28VBR

Auxiliary ZL50-9-2

Main ZSN4-280-21B

Auxiliary Y180L-6

160

15

Ø3.6×55m 30-92 0.39-3.9 3 Groups

Main ZSY500-40

Auxiliary ZSY180-31.5

Main ZSN-315-072

Auxiliary Y180L-4

250

22

Ø4.0×60m 32-105 0.39-3.9 3 Groups

Main ZSY630-35.5

Auxiliary ZL65-16

Main ZSN4-355-092

Auxiliary Y200L-4

315

30