Send Message
Home > products > Vertical Grinding Mill >
Cement Clinker 85TPH 110TPH Vertical Grinding Mill

Cement Clinker 85TPH 110TPH Vertical Grinding Mill

110TPH Vertical Grinding Mill

85TPH Vertical Grinding Mill

110TPH Vertical Raw Mill

Place of Origin:

China

Brand Name:

ZK

Certification:

CE ISO Certification

Model Number:

ZKRM22.3

Contact Us
Request A Quote
Product Details
Product Name:
Vertical Grinding Mill Technical Process Simple /Long Service Life Vertical Raw Mill
Capacity:
1.5~110 (t/h)
Applicable Materials:
Clinker, Raw Meal Etc
Color:
Customized
Service:
Design, Manufacturing, Sales
Spare Parts:
Supply
Voltage:
220V/380V/440V
Business Scope:
Design, Manufacturer, Onsite Guidance
Warranty:
One Year
Payment & Shipping Terms
Minimum Order Quantity
1 Set
Price
Negotiable
Packaging Details
Export standard container or as customers' requirements
Delivery Time
30 days
Payment Terms
L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability
20 Set / Sets per Month
Product Description

Vertical Grinding Mill Technical Process Simple /Long Service Life Vertical Raw Mill

 

Vertical Raw Mill Introduction:
Vertical raw mill is widely accepted as the most efficient means of preparing most moist raw materials for the production of cement clinker. Vertical raw mill can prepare virtually any kiln feed material to your required fineness in an energy-efficient process – regardless of variations in grindability, drying requirements and abrasion. In fact, it can be adapted to a wide variety of specific requirements.

 

Parameter of Cement Vertical Mill:
 
Model Grinding plate(mm) output(t/h) output(×10kt/a) Main motor power(kW)
diameter Pitch blast furnace slag cement Raw meal blast furnace slag cement Raw meal
ZKRM08.2 1200 800 1.5~2 3~4 6~8 1.5 3 5.5 55
ZKRM11.2 1500 1100 3~4 5~6 10~12 3 4.5 9 110
ZKRM13.2 1700 1300 8~9 11~13 20~22 6 9.5 17 185
ZKRM15.2 1900 1500 9~10 14~16 26~34 8 12 24 250
ZKRM17.2 2100 1700 12~14 20~23 40~50 10 17 36 355
ZKRM19.2 2300 1900 15~17 24~26 50~60 13 20 43.5 450
ZKRM20.2 2400 2000 18~20 27~30 60~75 15 22.5 55 560
ZKRM22.3 2600 2200 23~25 40~50 85~110 20 35.5 77 710

Remarks: the basic standard for vertical mill is as follow:

(1)Power consumption:slag≤25kWh/t,cement≤18kWh/t,raw meal≤9kWh/t;

(2)Moisture content:slag≤15%,cement≤3%,raw meal≤7%;

(3)Ffinished product fineness: specific surface area of slag 4200~4500cm²/g,specific surface area of cement 3300~380 cm²/g,raw meal fineness-80μmR 12~15%;

(4)Moisture content of refined powder:slag 0.5~1.0%,cement 0.5~1.0%,raw meal 0.5~1.0%;

(5)The specific installed capacity and parameters can be adjusted properly according to actual material nature.

(6)The above parameters are applicable for granular blast furnace slag, cement and raw meal and the model selection is determined by material property.

 

Cement Clinker 85TPH 110TPH Vertical Grinding Mill 0

 

Vertical Raw Mill Working Principle:
The raw material from dosing station after weighing, transported into inlet of vertical mill by belt conveyor, then fed into rotary air lock of vertical mill with outer recycle materials, after the grinding, drying, separating, the crude material comes back grinding disc for grinding again, the qualified product will be brought into cyclone filter through separator, the product collected by cyclone filter and powder from bag filter at the kiln tail comes into raw meal homogenizing silo by air chute, bucket elevator and so on.

The part of exhaust gas from cyclone filter came back into air inlet of vertical mill, and other will be discharged into atmosphere through kiln system filter, fan and chimney.
The heat air source of raw material vertical mill is from high temperature fan and preheater exhaust gas.

 

Cement Clinker 85TPH 110TPH Vertical Grinding Mill 1

 

Start of the Pulverized Coal Vertical Mill System:

Startup: Lubrication system (Thin oil station) motor → Separator motor (frequency conversion motor) → Roller lifting → Main motor → Feeding and falling roller → Hydraulic system motor (pressurizing).

 

Normal Shutdown Process of Pulverized Coal Vertical Mill System:

Shutdown: Stop material command start----Feeding operation stop----Start roll lifting operation----Vertical mill main motor stop----Oil station operation stop----Hydraulic station stop

 

Cement Clinker 85TPH 110TPH Vertical Grinding Mill 2

 

 

Send your inquiry directly to us

Privacy Policy China Good Quality LECA Production Line Supplier. Copyright © 2020-2024 zk-kiln.com . All Rights Reserved.