Product Details
Capacity::
50 T/d - 3000 T/d
Type:
Dry Process Cement Plant
Material:
Limestone, Clay, Gypsum, Fly Ash, Slag
Main Equipment:
Cement Mill, Cement Kiln, Dust Collector, Cooler, Etc.
After Service:
Supply
Onsite Service:
Engineer Onsite Guidenance
Small Scale:
25-200t/d
Medium Scale:
300-1500t/d
Large Scale:
1500t/d-3000t/d
Equipment Condition:
New
Payment & Shipping Terms
Minimum Order Quantity
1 Set
Price
Negotiable
Packaging Details
MEET THE SHIPPMENT REQUIREMENTS
Delivery Time
30DAYS
Payment Terms
L/C, D/A, D/P, T/T, Western Union, MoneyGram
Product Description

200- 300 TPD cement manufacturing plant equipment

 

We provide the full range service including design, manufacturing, installation for new type dry method cement production line with capacity from 50t/d to 3000t/d.

 

Process of Cement Production Plant:

1. Raw Materials
The main raw materials used in the cement manufacturing process are limestone, sand, shale, clay, and iron ore. The main material limestone is usually mined on site while the other minor materials may be mined either on site or in nearby quarries. Another source of raw materials is industrial by-products.

 

2. Raw Material Preparation
Mining of limestone requires the use of drilling and blasting techniques. Blasting produces materials in a wide range of sizes from approximately 1.5 meters in diameter to small particles less than a few millimeters in diameter.
Material is loaded at the blasting face into trucks for transportation to the crushing plant. Through a series of crushers and screening, the limestone is reduced to a size less than 100 mm.
Depending on size, the minor materials (sand, shale, clay, and iron ore) may or may not be crushed before being stored in separate areas.

 

3. Crushing and Pre-homogenization
Most of the raw materials must be first crushed before being used to make cement. These raw materials include limestone, clay, iron ore, coal and etc. Limestone is the largest amount of raw materials to make cement. According to the raw materials' different particles and hardness, there are many crushers used in crushing these raw materials, such as jaw crusher, impact crusher, cone crusher and vertical shaft impact crusher and etc.

 

4. Raw Material Homogenization
In the process of new dry cement production, the stability of pit entry clinker raw material component is the premise of the whole system. Raw material homogenization system plays very important role in the stability of pit entry clinker raw material component.

 

5. Preheater and Calciner
Raw material preheating and decomposition is completed by preheater, which can improve the kiln system productivity and reduce heat consumption of clinker Purposes.

Stable Running Cement Plant Equipment 200- 300 TPD Low Power Consumption 0

 

6. Cement Clinker Burning
Raw material is carried out into the rotary kiln clinker for completion after preheating in the preheater and pre-decomposition.


7. Cement Clinker Grinding
Cement Grinding is the last process of cement production line, also the most power consuming process. Its main function is to grind the cement clinker (and gelling agent, performance tuning materials, etc.) into the appropriate size and a certain particle size distribution, which is for increasing the size of its hydration, accelerating the hydration rate and meeting the coagulation, hardening requirements.

 

Stable Running Cement Plant Equipment 200- 300 TPD Low Power Consumption 1
 

8. Cement Packaging.
We adopts advanced technology and equipment to improve the efficiency, technical level, advanced design, ensure the economical investment for the cement production line.

 

Features
1. High Efficiency
Cement production line adopts advanced technology and equipment to raise technical level and to ensure design indexes. New five-stage cyclone pre-heater system, high efficiency air girder grate cooler, multi-passage pulverized coal burner, Davison heat temperature fan, jet pulse dust collector, as well as chain-board elevator, chain conveyor adopted in this production line can ensure that the technology is advanced compared to other production lines with the same scale.

 

2. Saving Energy
Measures have been taken to save energy and reduce consumption. using chain-board elevator and air slides, reliability of the system is enhanced and conveying energy consumption is decreased.

 

3. Environmental protection
Effective measures have been taken to guarantee strict environment protection standards. Different efficient dust collectors are set at all dust producing points according to different characteristics of waste gas.

 

4. High degree of automation
There is no manual operation in the process of mill running, which realizes the automatic control with long-term, stable, effective, makes milling process more stable, realizes fine work of production.

 

Our Service

ZK CORP design research institute base on the foundation of imported technologies, absorbing others successful experience from domestic and abroad, through a series of experimental research work, we successfully complete the systemic development and research work of preheater and precalciner with independent intellectual property rights, finally we got the ability to provide a series of equipment of 100-3000 T/D cement clinker production. Our preheating& precalciner system has a series of unique technical characteristics, such as low resistance, high decomposed rate, high fuel adaptability, good anti clogging performance, high operational flexibility and reliable production.

 

 

FAQ:

What price terms you offer?

We can offer FOB/CFR/CIF/EXW and other price terms based on your request.

 

What payment terms you take?

We prefer T/T, but other terms also acceptable.

 

We kind of service you provide?

We provide Turnkey service, and also we could help you to train your stuff.

 

Can I visit your company?

Of course, our company located in Luoyang city Henan province, you are welcome to visit our place.

 

If you want to get price, please send email ec03@zkcorp.com or WhatsApp number:+86-18937185591.

 

Send your inquiry directly to us

Privacy Policy China Good Quality LECA Production Line Supplier. Copyright © 2020-2024 zk-kiln.com . All Rights Reserved.